Gaining Productivity & Efficiency in Wine Manufacturing

75% Efficiency Gain Achieved with AE’s Precision Change Parts

Downtime loss avoided: $5,000–$20,000/hr

+75% efficiency improvement on one line

+30% productivity gain on a second line

Seamless Lean & Green implementation at scale

The Challenge

Alternative Engineering:

Long OEM lead times for replacement parts

Bottling line issues during packaging upgrades

Production delays caused by ill-fitting components

Costly downtime, with potential losses of
up to $20,000/hour

TWE also aimed to introduce new Lean & Green bottling tech without compromising quality or output.

The Solution

Alternative Engineering:

Reverse-engineered and locally manufactured precision change parts

Digitally measured tolerances to 3 decimal places for a perfect fit

Delivered rapid turnaround under tight project timelines

TWE also aimed to introduce new Lean & Green bottling tech without compromising quality or output.

Outcome

Metric Result
Line Efficiency +75% (from 65% to 90%) at Casella
Productivity Gain +30% on a second Casella line
Output Increase +10% improvement at Treasury Wine Estates
Downtime Avoidance Significant savings: $5k–$20k/hr risk mitigated
Part Accuracy First-fit success with zero rework
“Alternative Engineering produced accurate change parts that fit our machines perfectly.
Anthony Zuccato
Maintenance Supervisor, Casella Wines